The frame is going up quite fast, they've done what we can see on the pic on the first floor in one day.

La structure de bois se monte assez vite, le premier etage a ete monte en un jour...
Ca fait un peu peur de voir comment les maisons sont faites ici...mais c'est pour tout le monde pareil...(y'a quand meme des ingenieurs derriere tout ca! :-))






There is our first problem (photo below), the frame overhangs the slab by 2cm on the south side of the house and also on the East side.
I called our SS about that and he told me that it could and will be fixed if needed (it needs to be fixed, maximum overhang is 10mm).
I've on my side booked for an independent inspection of the frame to make sure that everything is up to the Australian Building Code Standards...

Voila notre premier probleme (y'en aura d'autres!!), la structure de bois qui depasse la dalle de 2cm cote Sud et cote Est.
Le chef de chantier dit que ca peut se rectifier si necessaire (c'est necessaire puisque j'ai verifie et la tolerance maximale de depassement est de 10mm).
On a pris rendez-vous avec notre inspecteur independant pour etre sur qu'ils font la rectification correctement et dans les standards australiens.




Photo du bas, cote Ouest, on a de la marge de 2cm...Y'a eu un petit probleme avec le coulage de la dalle, c'est certain...

The bottom picture, at the East side of the house shows some extra concrete after the frame (2cm) but it's not all the way....(weird) it really shows that we've had a problem with the slab initially...